Mesaj gönder
Ana sayfa Haberler

hakkında şirket haberleri Lagang Tüneli Projesi Blok Buz Makineleri

Sertifika
Çin Guangzhou Icesource Refrigeration Equipment Co., LTD Sertifikalar
Çin Guangzhou Icesource Refrigeration Equipment Co., LTD Sertifikalar
Müşteri yorumları
Your service good, and we contact for a long, your cube ice machine reliable -- Mentor, Kosovo

—— Mentor from Kosovo

Because CBFI block ice machine, cube ice machine, cold room quality good. so i choose your company

—— Haitham from Saudi Arabia

Emily - I hope you are healthy and happy. I am glad to receive all cold room containers and it looks very good like we expected. Thanks Rusty.

—— Rusty Brown from CA , USA

the ice block ice machine is operating well thanks

—— Ismaila Silue

let me inform you, that both CS's are assembled and our grantee is very satisfied! thanks for good cooperation!

—— Malkhaz Bregadze

we are very happy with the quality of the work done by CBFI for manufacture and installation of Freezer and cooler rooms in our facility in Chicago

—— Soni

Ben sohbet şimdi
şirket Haberler
Lagang Tüneli Projesi Blok Buz Makineleri

hakkında en son şirket haberleri Lagang Tüneli Projesi Blok Buz Makineleri  0

hakkında en son şirket haberleri Lagang Tüneli Projesi Blok Buz Makineleri  1

hakkında en son şirket haberleri Lagang Tüneli Projesi Blok Buz Makineleri  2

hakkında en son şirket haberleri Lagang Tüneli Projesi Blok Buz Makineleri  3

The tunnel is the longest tunnel currently running through the Lalin Railway, with a total length of 7684 meters, of which the single-line tunnel is 7309 meters long, the station tunnel is 375 meters long, and the maximum buried depth is 1237 meters. Tünel, Lalin Demiryolundan geçen en uzun tünel olup, toplam 7684 metre uzunluğunda, tek hat tüneli 7309 metre uzunluğunda, istasyon tüneli 375 metre uzunluğunda ve maksimum gömülü derinliği 1237 metredir. The altitude of the tunnel is 3164 meters, the ground stress is large, the rock burst section is long, and the construction environment is extremely bad, which brings great difficulties and challenges to the construction. Tünelin yüksekliği 3164 metredir, zemin stresi büyük, kaya patlaması bölümü uzun ve inşaat ortamı son derece kötü, bu da inşaat için büyük zorluklar ve zorluklar getiriyor. On August 24, 2018, the Zhulagang Tunnel of the Lalin Railway, which was built by the tunnel company, was completed 38 days ahead of the contract period. 24 Ağustos 2018'de, tünel şirketi tarafından inşa edilen Lalin Demiryolu'nun Zhulagang Tüneli, sözleşme döneminden 38 gün önce tamamlandı.

Pub Zaman : 2020-06-22 15:12:30 >> haber listesi
İletişim bilgileri
Guangzhou Icesource Refrigeration Equipment Co., LTD

İlgili kişi: Mr. Henry Lin

Tel: 86-180 2621 9032

Faks: 86-20-39199299

Sorgunuzu doğrudan bize gönderin (0 / 3000)